Scroll down

Half Bolt Anchor and Walkway

In the landscaping, the solutions in the appropriate architecture will create a more regular city planning. Among these, your projects will be much more planned and organized with our half-pass anchor and walkway works.

Half Bolt Anchor and Walkway

Half Bolt Anchor and Walkway

Half Bolt Anchor and Walkway

This design can be used in certain architectural style in appropriate areas with environmental regulations. The solutions will create a more regular city planning. Thus your project will be much more planned and organized with our half-pass anchor and walkway works. half-anchor anchor and with our walkway works, your projects will be much more planned and organized.

What is Anchor?

The connection of steel reinforcement into concrete in concrete structures is called anchorage. The coating keeps the face coating. These steel bars connect to the floor. The rod anchor is formed by drilling the ground with a pistol or drill. The remaining space around the rod is filled by injection. Face coating is made with anchor rods. in some studies the bars can be pre-stressed.

Ground anchors are preferred to transfer tensile forces from construction to the ground. In general, the anchor consists of three main parts. Root, tendon and head are these sections. The anchor transfers the tendon to the bridge. The bridge is then glued to the ground and thus compressed.

Half Insert Anchor

The gratings, which are made of distributor and carrier elements, are called half-pass anchors. It is generally used as a dispersing element. It is called half-pass in which it is 1/3 and half of the carrier plates. The binding lamellae, which are inserted into the notches in flat forms opened in the carrier lamellae, consist of intersection points intermittently. These products can be used in architectural projects such as walkways and platforms, treatment plants, casing systems and ships.

Walkway Construction

The construction of the walkway, which is among the most essential of a project, consists of three phases in general. Before these parts, projecting is done. In the first stage, infrastructure works, in the second stage rubber coating and the last stage is to draw the lines. There are different shapes in the flooring stage. The first of these is the 8+ 5 Epdm hiking trail; the second is the 8 + 7 Epdm walking path; 23 + 7 Epdm walking path; SBD is a walking path.

Particular attention should be paid to certain criteria for successful project design. These can be listed as follows.

 - Analysis of the existing area and especially plant counting.

 - Color CAD plans are very important.

 - The project is evaluated as a whole. Apart from walking paths, terraces, vehicle paths, fences and walls, bids, pergolas and arbor, pool and water elements are considered as a whole.

 - Herbal projects are prepared one by one.

 - Lighting projects are evaluated.

 - Three-dimensional realistic presentations are prepared.

 - Previous and next views are compared together.

 - Construction documents and details are checked.

 - Tender review is conducted and project audit is checked.

 - Plant selection from nursery is made in accordance with the project.

 - Plant placement and accessory selection is completed.

 Pre-Project Activities

The project area is visited. The measurements are taken. Existing items are processed. The structure of the soil is examined for infrastructure studies. Climatic characteristics and permanent wind direction are determined. Before the plants are placed in the field, some studies are carried out and in this way the functional properties of the place are emphasized in order to create a pleasant visual effect. Within the scope of the prepared project, walkways are built.

Walking paths are very important for the creation of social spaces in real estate projects. For this reason, walkway projects covered with green areas are included in real estate projects. In addition to this, in accordance with regular and planned urbanism, walking path projects are also included in the city centers. Starting with feasibility studies, the projects are managed successfully with planning and progress reports. This will make your project more valuable in every aspect. Quality, duration and financial controls of manufacturing are also performed in all studies. This ensures that the technical and administrative support offered at each stage results in quality projects.

Strong Social Media, Strong Relations

Our customers are very valuable for us,  our social media accounts to get closer FACEBOOKInstagrampinterest TWITTERYOUTUBE You can follow our videos from our channel.

© Copyright 2019 / Solmaz Metal
Go upstairs